Final Draft (August 10, 2018) - Noble Energy Comprehensive Drilling Plan (CDP) in Weld County
Final Draft (August 10, 2018)
Exhibits
- Exhibit A - Noble CDP Leasehold
- Exhibit B - Topography
- Exhibit C - Mustang CDP Development
- Exhibit D - Drilling and Spacing Units
- Exhibit E - Aerial Photo
- Exhibit F - Mustang CDP Access Roads
- Exhibit G - Mustang CDP Existing/Constructed Pipelines
- Exhibit H - Mustang CDP National Wetland Inventory and FEMA Floodplains
- Exhibit I - Mustang CDP Building Units
- Exhibit J - Utilities
- Exhibit K - Mustang CDP Mines
- Exhibit K (Continued) - Mustang CDP Oil and Gas Wells
- Exhibit K (Continued) - Mustang CDP Water Wells
- Exhibit L - Facility Equipment List
- Exhibit M - Econode Design
- Exhibit N - Mustang CDP Wildlife/Floodplain
- Exhibit N1 - Mustang CDP Colorado Parks and Wildlife
- Exhibit O - Mustang CDP Reclamation Areas
- Exhibit O1-1 - Reference Area Pictures (Guttersen Ranch and Southwestern DSUs)
- Exhibit O1-2 - Reference Area Pictures (Milton Reservoir)
- Exhibit O1-3 - Reference Area Pictures (Northeastern DSUs)
- Exhibit O2 - Reclamation Area 1 - Guttersen Ranch and Southwestern DSUs - Soil Map
- Exhibit O2 - Reclamation Area 2 - Milton Reservoir - Soil Map
- Exhibit O2 - Reclamation Area 3 - Northeastern DSUs - Soil Map
- Exhibit O3 - Typical Production Facility Reclamation Area Exhibit
- Exhibit O3 - Typical Well Pad Reclamation Area Exhibit
- Exhibit P - Surface Owners within the CDP
Click HERE to return to Noble Energy CDP information page