Name | Work Unit | |
---|---|---|
Doug Andrews | OGLA |
Document Title | Revision Date |
---|---|
Floodplain Rules Changes to the Form 2A | June 16, 2015 |
Form 2 and Form 2A Local Government Information | July 12, 2019 |
Form 2A and Form 2: Docket Numbers | July 29, 2019 |
Form 2A and Form 2: Docket Numbers | July 29, 2019 |
Operator Guidance - Rule 604 - Building Unit Owner/ Tenant Informed Consent | April 6, 2021 |
Operator Guidance - Rule 604 - Building Unit Owner/ Tenant Informed Consent | April 6, 2021 |
Operator Guidance - Rule 604 - Building Unit Owner/ Tenant Informed Consent | April 6, 2021 |
Rule 303.d: Sundry or New Form 2A | June 19, 2018 |
Rule 304.d Lesser Impact Area Exemption Refresher | June 8, 2021 |
SB 19-181 Required Director Objective Criteria | May 16, 2019 |
Tribal Permitting Matrix | February 18, 2014 |
Wildlife Tab Guidance (eForms) | November 15, 2016 |
Template Name | Instructions | Revision Date |
---|---|---|
Docket Forms Template | ![]() | July 14, 2019 |
Local Government Information Data Template Local Government Information Google Form | ![]() | May 28, 2019 |
Permit Priority List Template | ![]() | August 23, 2019 |
Statewide Informed Consent Letter Template | ![]() | April 6, 2021 |
Weld County Informed Consent Letter Template | ![]() | April 6, 2021 |
These documents provide guidelines for the preparation of attachments for the Oil and Gas Location Assessment, Form 2A. Each document includes the following information for the attachment:
- Definition: definition from COGCC Rule 100 Series, if applicable (only a small number of attachments are defined by a 100 Series rule)
- Rule/Policy Citation: language from the COGCC rule or policy that serves as the basis for the attachment requirements
- Purpose: description of the purpose the attachment serves as part of the permit application
- Requirements: identification of instances in which the attachment is required, followed by a list of minimum requirements for the attachment itself
- Common Errors and Issues: a list of the most common errors and issues that COGCC staff encounters with operators' submittals of the attachment
- Notes: any additional information relating to the attachment, including reference to other COGCC guidance documents
NOTE
Every well is unique, with a specific set of parameters that dictate the regulatory requirements. This means it is not possible to create a "one-size-fits-all" guide for the preparation of the attachments for a Form 2A. This document is not a comprehensive list of all potential requirements and errors; it focuses on the more common issues and errors.
TIP
If you are preparing the attachments for a Form 2A for a well with circumstances that you have never encountered before, contact COGCC staff to discuss the possible issues related to the attachment requirements prior to submittal.
Document Title | Revision Date |
---|---|
304.b.(7).B Layout Drawing Attachment Guidance | June 24, 2021 |
304.b.(7).D Preliminary Process Flow Diagram | June 8, 2021 |
304.b.(7).G Related Location and Flowline Map Guidance | June 11, 2021 |
Construction Layout Drawings | November 3, 2014 |
Facility Layout Drawing | October 10, 2014 |
Geologic Hazards Map 304.b.(7).I Geologic Hazards Plan 304.c.(21) | June 7, 2021 |
Guidance 304.b.(7).C Wildlife Habitat Drawing | July 14, 2021 |
Guidance 304.b.(7).F - Access Road Map | February 19, 2021 |
Guidance 304.b.(7).H Directional Well Plat | June 25, 2021 |
Hydrology Map | October 10, 2014 |
Location Drawing | October 10, 2014 |
Location Pictures | September 14, 2017 |
NRCS Map Unit Description | September 14, 2017 |
Reference Area Map | October 10, 2014 |
Reference Area Pictures | October 10, 2014 |
Rule 305.a. Certification | September 14,2017 |
Rule 306.e. Certification | September 14,2017 |
Siting Rationale | In Preparation |
Surface Use Agreement | November 18, 2014 |
Document Title | Revision Date |
---|---|
Community Outreach Plan Guidance | December 13, 2024 |
Geologic Hazards Map 304.b.(7).I Geologic Hazards Plan 304.c.(21) | June 7, 2021 |
Guidance 304.b.(8) Emergency Response Plan | February 16, 2021 |
Guidance 304.c.(11) Waste Management Plan | September 15, 2021 |
Guidance 304.c.(17). Wildlife Protection Plan | June 25, 2021 |
Guidance 304.c.(2) Noise Mitigation Plan | January 18, 2022 |
Guidance 304.c.(3) Light Mitigation Plan | September 16, 2021 |
Guidance 304.c.(4) Odor Mitigation Plan | August 18, 2021 |
Guidance 304.c.(7) Operations Safety Management Program Plan | February 16, 2021 |
Guidance 304.c.(9) Flood Shut-In Plan | February 18, 2021 |
Guidance 304.D. Lesser Impact Areas | February 18, 2021 |
Plan de Desarrollo de PetrĂ³leo y Gas | December 13, 2024 |
No example of this form is currently available.