ALERT (as of 12/16/2025): Due to inclement weather, Xcel Energy may shut off power across the front range as a safety precaution. In the event that these outages affect the ECMC's ability to conduct or maintain quorum for the 12/17/2025 Hearing, the hearing will adjourn and all pending matters will be continued to 1/7/2026. Check our hearings calendar for the most up-to-date information. 

 
1

Noble Energy Comprehensive Drilling Plan (CDP) in Weld County

The purpose, scope and information requirements of CDPs are described in COGCC Rule 216. Unlike COGCC permits for individual oil and gas locations, CDPs address multiple locations and the associated infrastructure in a geographic area. Development of the CDP will include operator engagement with COGCC, CDPHE, CPW, local governments, and surface owners within the boundaries of the proposed CDP Area. Discussions about potential impacts and measures to minimize them are a formal part of the planning process. Availability of CDP documents and opportunities for public participation will be announced on the COGCC website.

Note - all dates below are subject to change.